Electrical Panel Upgrade
Most homes built before 1990 have a 100 amp panel, enough for the house they were built for. Add an EV, a heat pump, and an induction range, and it runs out of room. An upgrade takes one day of work, but the power company sets the pace, so we plan around them.
- Starts at
- From $2,800
- Takes
- One day without power, three to five weeks from yes to signed off

Do you need one?
- The panel check says your planned load is over the panel rating
- Breakers trip when two big appliances run together
- The panel is a brand recalled or known for failing breakers, or it has fuses
- There is no space left for a new breaker
- An insurer or home inspector flagged it
What is included
- Load calculation for what you have and what is coming
- Permit, plan review where needed, and inspection
- Power company disconnect and reconnect booked for you
- Grounding and bonding brought up to code
- A typed panel directory
Worth knowing. A panel that is only full, not overloaded, can often take a subpanel or tandem breakers for much less. And a load manager can let an EV share a 100 amp panel. We price the cheaper fix too.
Options and prices
What it usually costs.
Sample prices for this demo. Your written price comes after a site visit, with the permit and inspection included.
- 01
Panel replacement, same size
New panel and breakers, service stays the same
$2,800 to $3,800
- 02
100 to 200 amp upgrade
New panel, meter base, and service cable
$3,900 to $6,500
- 03
Subpanel
For a garage, an addition, or a crowded main panel
$1,200 to $2,400
- 04
Smart panel
Circuit-by-circuit monitoring and control from your phone
add $1,500 to $3,000
The permit path
From yes to signed off.
Every stage, who does it, and how long it usually takes. Pick the day you would say yes to see your dates.
- Work on site
- 1 working day
- Signed off
- 10 to 27 working days
Sample durations for this demo. The power company and the city set some of the pace; we chase both.
Site visit and load calculation
We check the panel, the meter base, and the grounding, and size the new panel for what you have and what is coming.
Pick a date to see when
Permit filed
A panel or service upgrade needs a permit, and sometimes a plan review if the service size changes.
Pick a date to see when
Power company booked
The power company has to disconnect and reconnect your service. We book it; they set the date. This is usually the longest wait.
Pick a date to see when
Upgrade day
Power is off for six to eight hours. New panel, new breakers, grounding brought up to code, and every circuit labeled.
Pick a date to see when
Inspection and power on
Many towns inspect the same day so the power company can reconnect. If not, we set up temporary power.
Pick a date to see when
Signed off
Permit closed, a typed panel directory, and room on the panel for the next big thing.
Pick a date to see when
Panel upgrade questions
How do I know if my panel needs replacing?
Breakers that trip when two big things run, a panel that is warm or buzzes, fuses, no free spaces, scorch marks, or a brand known for failing breakers. If an insurer or inspector has flagged it, that settles it.
How long will the power be off?
Six to eight hours on upgrade day, usually 8 a.m. to mid-afternoon. We plan it with the power company so the fridge and freezer stay closed and you are back on before dark.
Other projects

CKT 01 40 A · 240 V
EV chargers
A Level 2 charger in the garage or on the drive: a full battery overnight, installed in a day.
From $1,150

CKT 03 22 kW · auto
Standby generators
A whole-home generator that starts itself in seconds when the power goes out.
From $9,500
A written price, before anything is wired.
Tell us the project and send a photo of your panel. You get a fixed price in writing, usually within two working days, with the permit and inspection included.