Projects
The big projects, explained first
EV chargers, panel upgrades, and standby generators are the jobs people research for weeks. Each page covers whether you need it, the options, sample prices, and the permit path, with dates.
Projects

CKT 01 40 A · 240 V
EV chargers
A Level 2 charger in the garage or on the drive: a full battery overnight, installed in a day.
From $1,150

CKT 02 100 → 200 A
Panel upgrades
A new panel and service for EVs, heat pumps, and induction cooking, with every circuit labeled.
From $2,800

CKT 03 22 kW · auto
Standby generators
A whole-home generator that starts itself in seconds when the power goes out.
From $9,500
How a project goes
Four steps, in writing.
- Step 1
Check the panel
Run the panel check, or send us a photo. It decides half the price of most projects.
- Step 2
A visit and a written price
We measure, do the load calculation, and send a fixed price with the permit included.
- Step 3
Permits and scheduling
We file the permits and book the power company when it is needed. You get dates, not "soon".
- Step 4
Install and inspection
Clean work, a labeled panel, and an inspection we attend, so you do not have to.
A written price, before anything is wired.
Tell us the project and send a photo of your panel. You get a fixed price in writing, usually within two working days, with the permit and inspection included.