Demo site by Digital Den
Switch industry demo
Get this site

Winter storm season: standby generator installs are booking about four weeks out. See the timeline

Projects

EV Charger Installation

A Level 2 charger adds 25 to 35 miles of range an hour, so the car is full every morning. Most installs take one day. The real question is whether your panel has room, so we answer that first.

Starts at
From $1,150
Takes
One day on site, about two weeks from yes to signed off
A wall-mounted EV charger with two charging cables on a wooden fence beside a brick house

Do you need one?

  • You charge from a regular outlet and it takes all night and then some
  • You are buying an EV, or a second one
  • You want charging scheduled for cheaper overnight rates
  • You are selling a house and want it EV-ready

What is included

  • Load calculation before we quote
  • Permit and inspection
  • Circuit, breaker, and wiring sized for the charger
  • Charger mounted and set up on your Wi-Fi
  • Test charge with your car

Worth knowing. If you drive under about 40 miles a day, a dedicated 240 V outlet may be all you need, and costs less than a hard-wired charger. We will tell you.

Options and prices

What it usually costs.

Sample prices for this demo. Your written price comes after a site visit, with the permit and inspection included.

  • 01

    Charger near the panel

    Garage panel, charger within about 20 feet

    $1,150 to $1,650

  • 02

    Longer run or outdoor mount

    Across a basement, through a wall, or on a post outside

    $1,650 to $2,600

  • 03

    With a load manager

    Lets a charger share a busy panel without an upgrade

    add $400 to $900

  • 04

    With a panel upgrade

    When the panel cannot take it (see panel upgrades)

    add $2,800 to $4,500

The permit path

From yes to signed off.

Every stage, who does it, and how long it usually takes. Pick the day you would say yes to see your dates.

Work on site
1 working day
Signed off
5 to 12 working days

Sample durations for this demo. The power company and the city set some of the pace; we chase both.

  1. Site visit and written price

    Us1 to 3 working days

    We look at the panel, measure the run to where you park, and do the load calculation. You get a fixed price in writing.

    Pick a date to see when

  2. Permit filed

    Us + City1 to 3 working days

    We file the electrical permit. Most towns approve a charger permit online or over the counter.

    Pick a date to see when

  3. Install day

    Us1 working day

    Usually one day: the new circuit, the charger on the wall, and a test charge with your car.

    Pick a date to see when

  4. City inspection

    City2 to 5 working days

    An inspector checks the work. You can charge in the meantime; we meet the inspector so you do not have to.

    Pick a date to see when

  5. Signed off

    YouSame day

    You get the permit sign-off, the warranty, and a panel directory with the new circuit labeled.

    Pick a date to see when

EV charger questions

Will my panel handle an EV charger?

Often, yes. A 200 amp panel usually has room; a 100 amp panel often does not, once you count an electric range, dryer, and air conditioning. The panel check on this site gives you a rough answer in a minute, and we confirm it with a full load calculation before quoting.

Do I need a hard-wired charger or just an outlet?

Either works. A 240 V outlet with your car's own cord is cheaper. A hard-wired charger is faster, tidier, works outdoors, and many rebates require one. If you drive under about 40 miles a day, the outlet is usually plenty.

Are there rebates for EV chargers?

Many power companies and states offer them, often $250 to $500 for a qualifying charger, sometimes more for a panel upgrade. Programs change often; we check what is current for your address and fill in the paperwork with you.

Other projects

  • CKT 02 100 → 200 A

    Panel upgrades

    A new panel and service for EVs, heat pumps, and induction cooking, with every circuit labeled.

    From $2,800

  • CKT 03 22 kW · auto

    Standby generators

    A whole-home generator that starts itself in seconds when the power goes out.

    From $9,500

A written price, before anything is wired.

Tell us the project and send a photo of your panel. You get a fixed price in writing, usually within two working days, with the permit and inspection included.

Website demo by Digital Den

About this demo

Demo Volt Electric is a fictional electrical contractor made by Digital Den to show what an electrician website can do: explain the big projects before quoting them, answer "will my panel handle it?" in a minute, turn a permit process into real dates, and send quote requests that arrive with a panel photo and the panel check attached. Every name, review, and price here is a sample.

  • A panel check that estimates the load and says room to spare, tight, or upgrade likely
  • Project explainers with a permit timeline that turns a start date into install and inspection dates
  • Quote requests that carry the project, a panel photo, and the panel check result

Get a site like this

  • Launch$2,500 to $3,500+ $149/mo
  • Growth$4,500 to $6,500+ $199/mo
  • Custom$7,500 to $10,000+ $249/mo

Live in about 2 weeks · 50% deposit to start · You own your domain · No calls needed: text or email