EV Charger Installation
A Level 2 charger adds 25 to 35 miles of range an hour, so the car is full every morning. Most installs take one day. The real question is whether your panel has room, so we answer that first.
- Starts at
- From $1,150
- Takes
- One day on site, about two weeks from yes to signed off

Do you need one?
- You charge from a regular outlet and it takes all night and then some
- You are buying an EV, or a second one
- You want charging scheduled for cheaper overnight rates
- You are selling a house and want it EV-ready
What is included
- Load calculation before we quote
- Permit and inspection
- Circuit, breaker, and wiring sized for the charger
- Charger mounted and set up on your Wi-Fi
- Test charge with your car
Worth knowing. If you drive under about 40 miles a day, a dedicated 240 V outlet may be all you need, and costs less than a hard-wired charger. We will tell you.
Options and prices
What it usually costs.
Sample prices for this demo. Your written price comes after a site visit, with the permit and inspection included.
- 01
Charger near the panel
Garage panel, charger within about 20 feet
$1,150 to $1,650
- 02
Longer run or outdoor mount
Across a basement, through a wall, or on a post outside
$1,650 to $2,600
- 03
With a load manager
Lets a charger share a busy panel without an upgrade
add $400 to $900
- 04
With a panel upgrade
When the panel cannot take it (see panel upgrades)
add $2,800 to $4,500
The permit path
From yes to signed off.
Every stage, who does it, and how long it usually takes. Pick the day you would say yes to see your dates.
- Work on site
- 1 working day
- Signed off
- 5 to 12 working days
Sample durations for this demo. The power company and the city set some of the pace; we chase both.
Site visit and written price
We look at the panel, measure the run to where you park, and do the load calculation. You get a fixed price in writing.
Pick a date to see when
Permit filed
We file the electrical permit. Most towns approve a charger permit online or over the counter.
Pick a date to see when
Install day
Usually one day: the new circuit, the charger on the wall, and a test charge with your car.
Pick a date to see when
City inspection
An inspector checks the work. You can charge in the meantime; we meet the inspector so you do not have to.
Pick a date to see when
Signed off
You get the permit sign-off, the warranty, and a panel directory with the new circuit labeled.
Pick a date to see when
EV charger questions
Will my panel handle an EV charger?
Often, yes. A 200 amp panel usually has room; a 100 amp panel often does not, once you count an electric range, dryer, and air conditioning. The panel check on this site gives you a rough answer in a minute, and we confirm it with a full load calculation before quoting.
Do I need a hard-wired charger or just an outlet?
Either works. A 240 V outlet with your car's own cord is cheaper. A hard-wired charger is faster, tidier, works outdoors, and many rebates require one. If you drive under about 40 miles a day, the outlet is usually plenty.
Are there rebates for EV chargers?
Many power companies and states offer them, often $250 to $500 for a qualifying charger, sometimes more for a panel upgrade. Programs change often; we check what is current for your address and fill in the paperwork with you.
Other projects

CKT 02 100 → 200 A
Panel upgrades
A new panel and service for EVs, heat pumps, and induction cooking, with every circuit labeled.
From $2,800

CKT 03 22 kW · auto
Standby generators
A whole-home generator that starts itself in seconds when the power goes out.
From $9,500
A written price, before anything is wired.
Tell us the project and send a photo of your panel. You get a fixed price in writing, usually within two working days, with the permit and inspection included.