Demo site by Digital Den
Switch industry demo
Get this site

Winter storm season: standby generator installs are booking about four weeks out. See the timeline

Projects

Standby Generator Installation

A standby generator sits outside like an air conditioner and starts by itself about ten seconds after the power goes out. Sized right, the house carries on: heat, fridge, sump pump, Wi-Fi. Order before storm season; equipment is the long wait.

Starts at
From $9,500
Takes
Two days on site, four to six weeks from yes to running
A white standby generator in a utility room, with two inverters and breaker boxes on the wall behind

Do you need one?

  • You lose power more than once or twice a winter
  • You rely on a sump pump, a well pump, or medical equipment
  • Someone in the house works from home
  • A portable generator and extension cords are getting old

What is included

  • Sizing for what you want running
  • Automatic transfer switch
  • Pad, gas line, and wiring
  • Electrical and gas permits and inspections
  • Live outage test and walkthrough

Worth knowing. If outages are rare and short, a portable generator with a proper inlet and interlock covers the essentials for a tenth of the price. We install those too.

Options and prices

What it usually costs.

Sample prices for this demo. Your written price comes after a site visit, with the permit and inspection included.

  • 01

    Essential circuits, 10 to 14 kW

    Heat, fridge, sump, lights, and outlets in a few rooms

    $9,500 to $12,500

  • 02

    Whole home, 18 to 24 kW

    Everything except the largest loads at once

    $12,500 to $17,000

  • 03

    Portable generator inlet

    A safe hookup for a portable, with an interlock

    $900 to $1,600

  • 04

    Yearly service plan

    Oil, filters, battery, and a load test

    $295 a year

The permit path

From yes to signed off.

Every stage, who does it, and how long it usually takes. Pick the day you would say yes to see your dates.

Work on site
1 to 2 working days
Signed off
11 to 28 working days

Sample durations for this demo. The power company and the city set some of the pace; we chase both.

  1. Site visit and sizing

    Us2 to 4 working days

    We size the generator to what you want running in an outage, pick a spot that meets the clearances, and check the gas supply.

    Pick a date to see when

  2. Permits and equipment ordered

    Us + City + Supplier5 to 15 working days

    Electrical and gas permits, plus the generator and transfer switch ordered. Delivery is usually the longest wait in storm season.

    Pick a date to see when

  3. Pad and gas line

    Us1 to 2 working days

    A level pad, the gas line run by our licensed gas fitter, and the trench or conduit for the wiring.

    Pick a date to see when

  4. Install and start-up

    Us1 to 2 working days

    Generator set, transfer switch wired, first start, and a live test with the power cut so you see it take over.

    Pick a date to see when

  5. Inspections

    City2 to 5 working days

    Electrical and gas inspections. We meet the inspectors and fix anything they ask for.

    Pick a date to see when

  6. Ready for the next outage

    YouSame day

    A walkthrough of the controls, the exercise schedule, and the first service date in your calendar.

    Pick a date to see when

Standby generator questions

What size generator do I need?

It depends on what you want running. Essentials (heat, fridge, sump pump, some lights and outlets) usually need 10 to 14 kW. A whole home with central air usually needs 18 to 24 kW. We size it from your panel, not from a brochure.

Natural gas or propane?

Natural gas if you have it: it never runs out and needs no deliveries. Propane works anywhere, but a whole-home unit can use a full tank in a few days of outage, so we size the tank too.

Other projects

  • CKT 01 40 A · 240 V

    EV chargers

    A Level 2 charger in the garage or on the drive: a full battery overnight, installed in a day.

    From $1,150

  • CKT 02 100 → 200 A

    Panel upgrades

    A new panel and service for EVs, heat pumps, and induction cooking, with every circuit labeled.

    From $2,800

A written price, before anything is wired.

Tell us the project and send a photo of your panel. You get a fixed price in writing, usually within two working days, with the permit and inspection included.

Website demo by Digital Den

About this demo

Demo Volt Electric is a fictional electrical contractor made by Digital Den to show what an electrician website can do: explain the big projects before quoting them, answer "will my panel handle it?" in a minute, turn a permit process into real dates, and send quote requests that arrive with a panel photo and the panel check attached. Every name, review, and price here is a sample.

  • A panel check that estimates the load and says room to spare, tight, or upgrade likely
  • Project explainers with a permit timeline that turns a start date into install and inspection dates
  • Quote requests that carry the project, a panel photo, and the panel check result

Get a site like this

  • Launch$2,500 to $3,500+ $149/mo
  • Growth$4,500 to $6,500+ $199/mo
  • Custom$7,500 to $10,000+ $249/mo

Live in about 2 weeks · 50% deposit to start · You own your domain · No calls needed: text or email