A standby generator sits outside like an air conditioner and starts by itself about ten seconds after the power goes out. Sized right, the house carries on: heat, fridge, sump pump, Wi-Fi. Order before storm season; equipment is the long wait.
- Starts at
- From $9,500
- Takes
- Two days on site, four to six weeks from yes to running

Do you need one?
- You lose power more than once or twice a winter
- You rely on a sump pump, a well pump, or medical equipment
- Someone in the house works from home
- A portable generator and extension cords are getting old
What is included
- Sizing for what you want running
- Automatic transfer switch
- Pad, gas line, and wiring
- Electrical and gas permits and inspections
- Live outage test and walkthrough
Worth knowing. If outages are rare and short, a portable generator with a proper inlet and interlock covers the essentials for a tenth of the price. We install those too.
Options and prices
What it usually costs.
Sample prices for this demo. Your written price comes after a site visit, with the permit and inspection included.
- 01
Essential circuits, 10 to 14 kW
Heat, fridge, sump, lights, and outlets in a few rooms
$9,500 to $12,500
- 02
Whole home, 18 to 24 kW
Everything except the largest loads at once
$12,500 to $17,000
- 03
Portable generator inlet
A safe hookup for a portable, with an interlock
$900 to $1,600
- 04
Yearly service plan
Oil, filters, battery, and a load test
$295 a year
The permit path
From yes to signed off.
Every stage, who does it, and how long it usually takes. Pick the day you would say yes to see your dates.
- Work on site
- 1 to 2 working days
- Signed off
- 11 to 28 working days
Sample durations for this demo. The power company and the city set some of the pace; we chase both.
Site visit and sizing
We size the generator to what you want running in an outage, pick a spot that meets the clearances, and check the gas supply.
Pick a date to see when
Permits and equipment ordered
Electrical and gas permits, plus the generator and transfer switch ordered. Delivery is usually the longest wait in storm season.
Pick a date to see when
Pad and gas line
A level pad, the gas line run by our licensed gas fitter, and the trench or conduit for the wiring.
Pick a date to see when
Install and start-up
Generator set, transfer switch wired, first start, and a live test with the power cut so you see it take over.
Pick a date to see when
Inspections
Electrical and gas inspections. We meet the inspectors and fix anything they ask for.
Pick a date to see when
Ready for the next outage
A walkthrough of the controls, the exercise schedule, and the first service date in your calendar.
Pick a date to see when
Standby generator questions
What size generator do I need?
It depends on what you want running. Essentials (heat, fridge, sump pump, some lights and outlets) usually need 10 to 14 kW. A whole home with central air usually needs 18 to 24 kW. We size it from your panel, not from a brochure.
Natural gas or propane?
Natural gas if you have it: it never runs out and needs no deliveries. Propane works anywhere, but a whole-home unit can use a full tank in a few days of outage, so we size the tank too.
Other projects

CKT 01 40 A · 240 V
EV chargers
A Level 2 charger in the garage or on the drive: a full battery overnight, installed in a day.
From $1,150

CKT 02 100 → 200 A
Panel upgrades
A new panel and service for EVs, heat pumps, and induction cooking, with every circuit labeled.
From $2,800
A written price, before anything is wired.
Tell us the project and send a photo of your panel. You get a fixed price in writing, usually within two working days, with the permit and inspection included.